MEG Energy | Midwest Group
423
portfolio_page-template-default,single,single-portfolio_page,postid-423,qode-quick-links-1.0,ajax_fade,page_not_loaded,,qode-title-hidden,qode_grid_1300,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-17.2,qode-theme-bridge,disabled_footer_bottom,wpb-js-composer js-comp-ver-6.10.0,vc_responsive

MEG Energy

Calgary, Alberta

Midwest Group was pleased to be part of the MEG Energy project run by general contractor Govan Brown. Located in Eau Claire Tower, Midwest’s scope encompassed 5 floors of drywall partitions, bulkheads, ceilings, and internal stairwells. Designer B+H Architects chose statement ceilings throughout MEG’s space, including wood ceiling panels and perhaps our favourite: Tincraft Bronze ceilings in the interview rooms, complemented by electric fireplaces.